Simulation Optimization for the Stochastic Economic Lot Scheduling Problem with Sequence-Dependent Setup Times

We consider the stochastic economic lot scheduling problem (SELSP) with lost sales and random demand, where switching between products is subject to sequence-dependent setup times. We propose a solution based on simulation optimization using an iterative two-step procedure which combines global policy search with local search heuristics for the traveling salesman sequencing subproblem. To optimize the production cycle, we compare two criteria: minimizing total setup times and evenly distributing setups to obtain a more regular production cycle. Based on a numerical study, we find that a policy with a balanced production cycle outperforms other policies with unbalanced cycles.

Article

Download

View Simulation Optimization for the Stochastic Economic Lot Scheduling Problem with Sequence-Dependent Setup Times