A 3/2-Approximation algorithm for two-machine flow-shop sequencing subject to release dates
The two-machine flow shop sequencing problem with arbitrary release dates of jobs and the minimum makespan criterion is considered. The problem is known to be NP-hard, and the best known approximation algorithms are those of Potts (1985) with a worst-case performance ratio of 5/3 and running time $O(n^3 \log n)$, and a polynomial time approximation … Read more