Improved Branch-and-Cut for the Inventory Routing Problem Based on a Two-Commodity Flow Formulation

This paper examines the Inventory Routing Problem (IRP) with Maximum Level inventory policy. The IRP is a broad class of hard to solve problems with numerous practical applications in the field of freight transportation and logistics. A supplier is responsible for determining the timing and the quantity of replenishment services offered to a set of … Read more

Flexible Job Shop Scheduling Problems with Arbitrary Precedence Graphs

A common assumption in the shop scheduling literature is that the processing order of the operations of each job is sequential; however, in practice there can be multiple connections and finish-to-start dependencies among the operations of each job. This paper studies flexible job shop scheduling problems with arbitrary precedence graphs. Rigorous mixed integer and constraint … Read more