Time Complexity and Optimality of Inventory and Production Policies for a Dynamic Lot Sizing Model with Remanufacturing and Separate Setup Costs

In this paper, we consider a dynamic lot sizing model with remanufacturing having m types of cores. The model also allows manufacturing. We consider separate setup costs for manufacturing and remanufacturing in our model. It is conjectured in [15], with reference to [18], that finding an optimal policy to the model when there is separate … Read more

A multi-stage stochastic integer programming approach for a multi-echelon lot-sizing problem with returns and lost sales

We consider an uncapacitated multi-item multi-echelon lot-sizing problem within a remanufacturing system involving three production echelons: disassembly, refurbishing and reassembly. We seek to plan the production activities on this system over a multi-period horizon. We consider a stochastic environment, in which the input data of the optimization problem are subject to uncertainty. We propose a … Read more