The increasing penetration of renewable energy and rising electricity demand are driving the need to integrate new buses and transmission lines into transmission grids. These trends are reshaping transmission expansion planning (TEP), motivating the development of effective methodologies to manage the resulting complexity. This paper introduces the longest shortest-path connection (LSPC) algorithm, a graph-based method to enhance the mixed-integer linear programming disjunctive formulation of TEP using valid inequalities (VIs). Traditional approaches for determining big-M coefficients in disconnected TEP networks typically rely on solving the computationally intensive longest path problem (LPP). In contrast, LSPC circumvents these limitations by efficiently identifying relevant power-flow paths between disconnected buses within the expansion network. We demonstrate that the VIs generated from these identified paths dominate those derived from LPP-based methods and other existing approaches.
Citation
B. Jabbari-Marand and A. R. Escobedo, “Polynomial-time algorithms for setting tight big-m coefficients in transmission expansion planning with disconnected buses,” Optimization Online, 2024, preprint. [Online]. Available: https://optimization-online.org/?p=28583