Integrated Optimization of Timetabling and Electric Vehicle Scheduling: A Case Study of Aachen, Germany

We tackle the integrated planning problem of periodic timetabling and electric vehicle scheduling, crucial for cities transitioning to electric bus fleets. Given existing timetables, we allow only minor modifications and propose an iterative solution approach that addresses the Electric Vehicle Scheduling Problem (EVSP) in each iteration. Due to the NP-hard nature of EVSP, we employ … Read more

The use of multi-criteria decision-making methods in project portfolio selection: a literature review and future research directions

In most project portfolio selection (PPS) situations, the presence of multiple attributes and decision-maker preference is inevitable. As Multi-criteria Decision Analysis (MCDA) methods provide a framework well-suited to deal with these challenges in PPS problems, the use of MCDA methods in real-life PPS problems has increased in recent years. This paper provides a comprehensive literature … Read more