A hybrid heuristic for the constrained two-dimensional non-guillotine orthogonal cutting problem

This paper addresses a constrained two-dimensional (2D) non-guillotine cutting problem, where a fixed set of small rectangles has to be cut from a larger stock rectangle so as to maximize the value of the rectangles cut. The algorithm we propose hybridizes a novel placement procedure with a genetic algorithm based on random keys. We propose … Read more

A Random Key Based Genetic Algorithm for the Resource Constrained Project Scheduling Problem

This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCPSP). The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities of the activities are defined by the genetic algorithm. The heuristic generates parameterized active schedules. The approach … Read more

A genetic algorithm for the resource constrained multi-project scheduling problem

This paper presents a genetic algorithm for the Resource Constrained Multi-Project Scheduling Problem (RCMPSP). The chromosome representation of the problem is based on random keys. The schedules are constructed using a heuristic that builds parameterized active schedules based on priorities, delay times, and release dates defined by the genetic algorithm. The approach is tested on … Read more

A hybrid genetic algorithm for manufacturing cell formation

Cellular manufacturing emerged as a production strategy capable of solving the problems of complexity and long manufacturing lead times in batch production. The fundamental problem in cellular manufacturing is the formation of product families and machine cells. This paper presents a new approach for obtaining machine cells and product families. The approach combines a local … Read more

A hybrid genetic algorithm for the job shop scheduling problem

This paper presents a hybrid genetic algorithm for the Job Shop Scheduling problem. The chromosome representation of the problem is based on random keys. The schedules are constructed using a priority rule in which the priorities are defined by the genetic algorithm. Schedules are constructed using a procedure that generates parameterized active schedules. After a … Read more