Minimum-Peak-Cost Flows Over Time

Peak cost is a novel objective for flows over time that describes the amount of workforce necessary to run a system. We focus on minimising peak costs in the context of maximum temporally repeated flows and formulate the corresponding MPC-MTRF problem. First, we discuss the limitations that emerge when restricting the solution space to integral … Read more

Multithread Interval Scheduling with Flexible Machine Availabilities: Complexity and Efficient Algorithms

In the known Interval Scheduling problem with Machine Availabilities (ISMA), each machine has a contiguous availability interval and each job has a specic time interval which has to be scheduled. The objective is to schedule all jobs such that the machines’ availability intervals are respected or to decide that there exists no such schedule. We … Read more

Efficient Algorithms for Multi-Threaded Interval Scheduling with Machine Availabilities

In the known Interval Scheduling Problem with Machine Availabilities (ISMA), each machine has a contiguous availability interval and each job has a specific time interval which has to be scheduled. The objective is to schedule all jobs such that the machines’ availability intervals are respected or to decide that there exists no such schedule. We … Read more

Minimum Color-Degree Perfect b -Matchings

The minimum color-degree perfect b-matching roblem (Col-BM) is a new extension of the perfect b-matching problem to edge-colored graphs. The objective of Col-BM is to minimize the maximum number of differently colored edges in a perfect b-matching that are incident to the same node. We show that Col-BM is NP-hard on bipartite graphs by a … Read more