An Efficient Algorithm to the Integrated Shift and Task Scheduling Problem

Abstract   This paper deals with operational models for integrated shift and task scheduling problem. Staff scheduling problem is a special case of this with staff requirements as given input to the problem. Both problems become hard to solve when the problems are considered with flexible shifts. Current literature on these problems leaves good scope … Read more

Exact solution methods for the Resource Constrained Project Scheduling Problem with a flexible Project Structure

The Resource Constrained Project Scheduling Problem with a flexible Project Structure (RCPSP-PS) is a generalization of the Resource Constrained Project Scheduling Problem (RCPSP). The objective of the RCPSP-PS is to find a minimal makespan schedule subject to precedence and resource constraints, while only having to execute a subset of all activities. We present a general … Read more

EETTlib – Energy-Efficient Train Timetabling Library

We introduce EETTlib, an instance library for the Energy-Efficient Train Timetabling problem. The task in this problem is to adjust a given timetable draft such that several key indicators relating to the energy consumption of the resulting railway traffic are minimized. These include peak power consumption, total energy consumption, loss in recuperation energy, fluctuation in … Read more

Steiner tree network scheduling with opportunity cost of time

This paper points out the impact of opportunity cost of time (high discount rate or high rate of time preference, time-dependent profits, etc.) in designing real-world Steiner trees like electricity, gas, water, or telecommunications networks. We present the Steiner Tree Scheduling Problem which consists of finding a Steiner tree in an activity-on-arc graph that spans … Read more

A Biased Random-Key Genetic Algorithm with Forward-Backward Improvement for the Resource Constrained Project Scheduling Problem

This paper presents a biased random-keys genetic algorithm for the Resource Constrained Project Scheduling Problem. The chromosome representation of the problem is based on random keys. Active schedules are constructed using a priority-rule heuristic in which the priorities of the activities are defined by the genetic algorithm. A forward-backward improvement procedure is applied to all … Read more

Parallel Cooperative Approaches for the Labor Constrained Scheduling Problem

In this paper we consider the labor constrained scheduling problem (LCSP), in which a set of jobs to be processed is subject to precedence and labor requirement constraints. Each job has a specified processing time and a labor requirements profile, which typically varies as the job is processed. Given the amount of labor available at … Read more